Our firm was the low-bidder on this new 19,800 sf alternative high school. The major building assemblies included a slab-on-grade concrete floor, concrete masonry walls, and a low-slope, single ply metal roof.
With an alternative education in mind, the building was designed with both indoor and outdoor learning spaces, and multiple “flex” learning spaces.
Client:
Sheridan County School District No. 2
Location:
Sheridan, Wyoming
Delivery Method:
Design-Bid-Build (Hard-Bid)
Architect:
GSG Architecture
Construction Start:
March 2020
Substantial Completion:
July 2021